
What this code means
P0010 may mean the PCM is detecting a possible electrical fault in the Bank 1 intake camshaft actuator control circuit.
What the vehicle may do
- The MIL may illuminate.
- Stop/start may be disabled when the code is active on vehicles equipped with that feature.
- The engine may have variable valve timing operation affected while the fault is present.
Possible fault areas
- Possible wiring or connector issues in the VVT intake solenoid control circuit.
- Possible open, shorted, or high-resistance control or ground circuit faults.
- Possible VVT intake solenoid concern.
- Possible PCM-side control concern after the circuit and connection checks pass.
Diagnostic path
Opening context
On this 2019 to 2024 Ram 1500 Classic with the 3.6 Pentastar, P0010 is for the Bank 1 camshaft position actuator control circuit, specifically the VVT intake solenoid 1/1 control side. In plain language, the PCM is seeing a possible electrical problem in the intake cam VVT solenoid circuit. The vehicle may turn the MIL on, and if it has stop/start, that system can be disabled while the code is active. The fault area is often wiring, connector condition, the solenoid control or ground side, the solenoid itself, or in the last part of the path, the PCM. Treat this like an electrical circuit diagnosis, not a mechanical timing diagnosis.
Monitor gate and first confirmation
Start with the basic system checks. The monitor runs with the engine running and battery voltage greater than 10.4 volts. Before chasing the circuit, scan all modules, record the codes and captured operating data, save the vehicle scan information, then clear the codes. Turn the ignition off for a minimum of 10.0 seconds, turn it back on, and reproduce the operating conditions that set the fault. Read the codes again. If P0010 does not return, handle it as an intermittent condition. If it does return, continue into the circuit checks.
Connector and terminal inspection
With the ignition off, go right to the VVT intake solenoid 1/1 connector. Before unplugging it, make sure it was fully seated and locked. Then disconnect it and inspect for pushed-out, damaged, or spread terminals. If you find a connector or terminal problem, repair the terminal issue or seat and lock the connector correctly, then verify the repair and confirm the code stays gone. If the connector and terminals look good, move on.
Control circuit short to voltage
Next, check the VVT intake solenoid 1/1 K76 control circuit for a short to voltage. Turn the ignition on and measure voltage on that control circuit at the solenoid harness connector. There should be no voltage present, except for a brief moment right after the ignition is turned on. If voltage is present beyond that brief normal pulse, repair the K76 control circuit for a short to voltage, then verify the repair. If there is no voltage, keep going.
Control circuit short to ground
Now check the same K76 control circuit for a short to ground. Turn the ignition off, disconnect the PCM C2 connector, and check continuity between ground and the K76 control circuit at the VVT intake solenoid 1/1 harness connector. If there is continuity to ground, repair the control circuit for a short to ground and verify the repair. If there is no continuity, continue with load testing.
Control circuit open or high resistance
Isolate and load test the K76 control circuit for an open or high resistance. Do not load test any circuit while components are still connected to that circuit. With the circuit isolated, the load test bulb should be illuminated and bright, and its brightness should compare to a direct connection to Battery. If the bulb is not illuminated and bright, repair the K76 control circuit for an open or high resistance, then verify the repair. If it passes, go to the ground side.
Ground circuit open or high resistance
Load test the VVT intake solenoid 1/1 Z908 ground circuit at the solenoid harness connector. Again, do not load test the circuit with components still connected. The bulb should be illuminated and bright, and you compare that brightness against a direct connection to Battery. If the bulb is not illuminated and bright, repair the Z908 ground circuit for an open or high resistance and verify the repair. If the ground circuit passes, move to the PCM driver operation check.
PCM driver operation and solenoid decision
Reconnect the PCM C2 connector and turn the ignition on. Use a 12-volt test light connected to ground and probe the K76 control circuit at the VVT intake solenoid 1/1 harness connector. The PCM may command the solenoid on briefly right after key-on; that brief flash is normal, and the light should then turn off and stay off if there is no short to voltage. Then use the scan tool to actuate the VVT intake solenoid 1/1 control to the highest duty cycle, 80%. The test light should be illuminated and bright, compared to a direct connection to Battery. If the light is illuminated and bright during the commanded actuation, replace the VVT intake solenoid 1/1, then verify the repair. If the light is not illuminated and bright, continue to the connection checks before condemning the PCM.
PCM and related connection checks
At this point, handle any applicable bulletins, then inspect the PCM connectors, related inline connectors if equipped, and related component connectors. Look for poor seating, damaged locks, corrosion, water intrusion, weather seal damage, bent terminals, overheated or discolored terminals, pushed-back terminals, spread terminals, and poor terminal tension. Repair any condition you find. Reconnect everything fully, make sure the locks are engaged, clear the codes, and operate the vehicle under the monitor conditions again. If P0010 does not return, the wiring or poor connection problem has been repaired. If it does return after these checks, the diagnostic path supports replacing and programming the PCM, followed by repair verification.
Closing takeaway
The clean path for P0010 is to prove the code returns, inspect the solenoid connector first, then test the control circuit for short to voltage, short to ground, open or high resistance, and load test the ground side. Only after the wiring and connector path passes do you use the driver command test to separate the solenoid from the PCM side. Verify the repair and confirm the code stays gone. For more diagnostic training, visit stepdiagnostics.com.
Final check
P0010 is often approached as a structured electrical circuit diagnosis for the VVT intake solenoid control path.
For more guided automotive diagnostics, visit STEP Diagnostics.





